Our Projects
Lake Placid Water Treatment Facility - Lake Placid, N.Y.
Construction of a 5.15 MGD water filtration plant including raw water wet well and pumps, chemical feed systems, two-stage pressure filters, CT tanks, a finished water pump, backwash water supply pumps, a backwash equalization pump, a recycle pump, a wastewater pump station, and a backwash equalization tank. Associated structural and architectural work, site work, underground piping, site grading, landscaping, and access roads are also included.